Jago Jeep, tub nearly off.

0923Image001

Made a big hole in the floor for the rollcage to come through when we lift the tub

0923Image000

Loads of brute force but no way was it moving, will need to lift the body quite high now to get it over the bar. Got the rear part of the cage out at this stage.

0923Image002

wood batons for people to hold onto when the lift comes.

0923Image002

Got more clearance with some of the weight out, think I’ll just leave it until I drive it, then if there is not enough up-travel I’ll chop about the rails to give it more, floors shall be unboltable which’ll make life easyier.

0923Image002

Tub moved back away from front cage.

0923Image002

All that didn’t take all day so I tried to put on the new body work on the cbr, I forgot the key for the new tank and that was the end of that.

0923Image002

black + red rear suit it.

0923Image002

Rust coming out from the water based paint, it too plain anyway so some strips maybe are called for.

Tags: , , ,

Leave a Reply

XHTML: You can use these tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>